Analisis Rencana Anggaran Biaya Pada Pembangunan Rumah Tinggal Studi Kasus Perumahan Bukit Palma Surabaya

Analisis Rencana Anggaran Biaya Pada Pembangunan Rumah Tinggal Studi Kasus Perumahan Bukit Palma Surabaya

  1. Program Studi Teknik Sipil, Fakultas Teknik, Universitas Yos Soedarso Surabaya, Indonesia

Abstrak

Pembangunan rumah tinggal memerlukan perencanaan biaya yang sistematis agar anggaran yang tersedia mampu memenuhi kebutuhan teknis dan fungsional bangunan. Rencana Anggaran Biaya (RAB) menjadi instrumen penting karena memberikan perkiraan kebutuhan biaya material, tenaga kerja, dan peralatan sebelum pekerjaan dilaksanakan. Penelitian ini bertujuan menganalisis RAB rumah tinggal tipe standar di Perumahan Bukit Palma, Surabaya, mengidentifikasi item pekerjaan dengan proporsi biaya terbesar, serta memberikan dasar pengendalian biaya konstruksi. Penelitian menggunakan metode deskriptif kuantitatif. Data diperoleh dari gambar kerja (bestek) dan data harga material di wilayah Surabaya. Volume setiap item pekerjaan dihitung mulai dari pekerjaan persiapan, tanah, struktur, hingga finishing, kemudian dikalikan dengan Analisa Harga Satuan Pekerjaan (AHS) yang digunakan. Hasil penelitian menunjukkan bahwa pekerjaan beton dan dinding memiliki proporsi biaya terbesar, yaitu 35,20%, diikuti pekerjaan finishing dan lain-lain sebesar 21,50%, pekerjaan atap dan plafon sebesar 18,60%, pekerjaan tanah dan pondasi sebesar 12,80%, pekerjaan kusen, pintu, dan jendela sebesar 8,40%, serta pekerjaan persiapan sebesar 3,50%. Estimasi biaya konstruksi berkisar antara Rp4.500.000 hingga Rp5.200.000 per meter persegi. Hasil tersebut menunjukkan bahwa ketelitian perhitungan volume dan pembaruan harga satuan merupakan faktor penting untuk mengendalikan perbedaan antara biaya rencana dan biaya pelaksanaan. Analisis ini dapat menjadi tolok ukur bagi pengembang dan pemilik rumah dalam mengalokasikan dana konstruksi secara efisien dengan tetap memenuhi standar teknis.

Abstract

The construction of residential houses requires careful and systematic cost planning to ensure that the available budget is sufficient to meet technical and functional requirements. A Cost Budget Plan (RAB) is an important planning instrument because it provides an estimate of expenditure for materials, labor, and equipment before construction is implemented. This study aims to analyze the RAB for a standard residential house in Bukit Palma Housing, Surabaya, identify work items with the largest cost proportions, and provide a basis for construction cost control. The study uses a descriptive quantitative approach. Data are obtained from working drawings (bestek) and material price data in Surabaya. Work volumes are calculated for each item, from preparation and earthworks to structural work and finishing, and are then multiplied by the applicable Unit Price Analysis (AHS). The results show that concrete and wall works account for the largest proportion of the budget, at 35.20%, followed by finishing and other works at 21.50%, roof and ceiling works at 18.60%, earthworks and foundations at 12.80%, joinery at 8.40%, and preparation at 3.50%. The estimated construction cost ranges from Rp 4,500,000 to Rp 5,200,000 per square meter. These findings indicate that accurate volume measurement and updated unit-price data are essential for controlling deviations between planned and actual construction costs. The analysis can be used as a benchmark for developers and homeowners in allocating construction funds efficiently while maintaining technical standards. The construction of residential houses requires careful planning, especially in terms of budget calculation. The Cost Budget Plan (RAB) is a vital document used to estimate the total costs required for materials, labor, and equipment. This study aims to analyze the RAB for residential houses in Bukit Palma Housing, Surabaya. The methodology involves calculating the volume of work items and multiplying them by the local Unit Price of Work (AHS). The results indicate that the total construction cost is influenced significantly by structural work and finishing materials. This analysis provides a benchmark for developers and homeowners to manage construction funds efficiently.

Cara mengutip

Tranggono, Nadia Sukma Chrisworo, & Rahma Gita Syafitri (2023). Analisis Rencana Anggaran Biaya Pada Pembangunan Rumah Tinggal Studi Kasus Perumahan Bukit Palma Surabaya. Civil Engineering Journal, 5(2), 7-9.